Projects
  • HOME
  • Projects

APPENDIX OF RECENT PROJECTS

  • Supply and installation of 2000amp change over Panel for Chemical and Allied Products Ltd(CAPL)
  • Power utility installation of 500KVA Marine Type Transformer and 33KV
  • MV outdoor breaker at MTN Cable Landing Station Okun Ajah
  • Supply and Installation of 2MVA Transformer for MTN NG Kano Switch
  • Supply and Installation of 2.5MVA Transformer at MTN Maritime House Apapa Switch, Lagos
  • Supply and Installation of 50KVA Transformer at Osbourne Foreshore Estate for MTN NG
  • Supply of 2 MVA transformers for Airtel Lekki and Abuja DC.
  • Survey, Design of Electrical details, Erection of Poles, Stringing of HT/LT power lines and installation/earthing of transformer and transformer Installation for Platinum Habib Bank (Bank PHB)
  • Complete earthing at Prudent energy Tank farm Oghara, Delta State for Prudent Energy PLC
  • Supply and Installation of 100m2 energy Container at MTN switch Durumi complete with Fire Protection system, Cooling system, Electrical system and Access control systems , Durumi Abuja
  • Supply and Installation of 2 nos of 120m2 Energy Container at Ojota Switch
  • PHCN Reactivation of over 60 sites across the country for ATC Nigeria
  • Repair of Shelters for I H S Nigeria
  • Site Audit and Maintenance of 43 sites for I H S Nigeria
  • Yellowatt security bunker, Procurement, mechanical fabrication of container, tank and electrical work for MTN
  • Turnkey BTS site building, survey, civil construction, electrical,mechanical land RF installations for Plessey/MTN
  • decommissioning of MTN sites (mobile and BTS)
  • Supply and installation of inverters, complete earthing works, supply and installation of power panels/ cables for Celtel Nigeria
  • Calibration of tools and equipment for IKEDC
  • Supply and installation of 2MVA transformer for MTN Nigeria Owerri and Abuja Switches
  • Supply and Installation of 2.5MVA Transformer and 33KV MV outdoor breakers with CT and VT at MTN Maritime house Apapa
  • AVR Maintenance for American Embassy, Dewkaf CC solutions
  • Construction of Shomolu BU River Bank substation for 500KVA
  • Transformer for Ikeja Electric PLC Calibration of tools and equipment for Ikeja Electric PLC

Gallery

PILOT-SCIENCE-TRANSFORMER-LAGOS-NIGERIA
koncept-datacenter-3d-interor-1600x850
PILOT-SCIENCE-TRANSFORMER-UPDATED2
Pilot-Science-20
Pilot-Science-4

Share